Torre De Apartment in villa olga santiago

Price
$218,000
Price/M²
$2,180
M² of construction
100
Bedrooms
2
Bathrooms
2.5
Parking
2

Torre De Apartment in villa olga santiago

Category

Sale

Published

08/02/2024

Location

Santiago

Price

$218,000

Price/M²

$2,180

Swimming pool

yes

PDF with property information

Download

Benefits

Guest Parking
24 hour Security
Party Room
Kids Park
Gym
Walk-In Closet
Lobby

Property

It is an imposing 15-level tower that is born in the heart of Santiago, located on the east side or of the sector La Esmeralda, Villa Olga, will be erected from the tranquility of Lic Street. Genaro Pérez is the protagonist of one of the most ambitious commercial areas in the city.


This proposal of avant-garde architecture will be only residential, 78 residential units in 15 levels where the Last Level will be 8 Spectacular Penthouses with Phenomenal Views to the entire City.

Apartments of 100, 106, 108, 110 mts2
- Room
- Eat
- Terrace Balcony
- Kitchen with breakfast
- 12 visiting bathroom for common areas
- 2 rooms
- Main room with walking closet and bathroom
- Secondary room with bathroom
- Closet of white clothes
- Washing area
- 2 parks assigned by apartment
Features:

-720 m2 of multipurpose area;
- Lobby for Visitors totally
air conditioned and furnished / 3.60 mts2 Height.
- 2 Exclusive Lobby for Owners
- Chofers and Employees Hall with Bathroom and Kitchenette.
- Electric gate
- Parks covered
- 4 elevators
- Full power plant
- Closed surveillance circuit (HD).
- Duct of garbage
- Counter-incension system
- Intercom HD
- Centralized gas system
- Lockers (available for sale)

Terminations:

• Flats in porcelain of first quality.
• Modular kitchens.
• Portage and Closet in Imported Oak Wood
• Kitchen top and backrest in granite
Natural Imported.
• White Line Included
• Gas heater.
• First Caliad Stainless Steel Grinding
• Techos with sheetrock.
• Baranda balcony in glass and stainless steel.
• High-quality tap
• Air Conditioning Pre-installations
• Water outlet for fridge.
• Departure of gas for dryer.
• Duct for extractor.
• Cisterna with Osmosis type water purification system.
Beginning of construction: December 2023
Date of delivery: 1st quarter of 2026


Payment form


Separate with 5,000 USD
Complete 10% to 45 days
35 per cent during construction (32 assessed contributions)
55% against delivery

Make an appointment

Mon
Tue
Wed
Thu
Fri
Sat
Sun
08:00 am
09:00 am
10:00 am
11:00 am
12:00 am
01:00 pm
02:00 pm
03:00 pm
04:00 pm
05:00 pm
06:00 pm
07:00 pm
Call